Carbon Reduction Plan
|
Document detail |
Information |
|
Plan owner |
Sarah Mainwaring / HR Manager |
|
Approval date |
August 2026 |
|
Baseline reporting period |
1 July 2025 – 30 June 2026 |
|
Baseline assessment |
Carbon Footprint Ltd – Sustrax self-assessed report generated 14 July 2026 |
|
Plan period |
18 August 2026 to 1st August 2027 |
|
Review frequency |
At least annually, with progress reviewed quarterly where practicable |
|
Version |
1.0 |
1. Purpose and commitment
KPI Recruiting Ltd is committed to understanding and reducing the greenhouse gas emissions associated with its activities. As a recruitment business with primarily office-based and digital operations, we will focus on practical measures within our control, including energy use in premises, business travel, purchasing and the use of IT and office resources.
This plan sets out our current emissions baseline, proposed reduction objectives, actions, responsibilities and arrangements for monitoring progress. We will prioritise measuring and reducing emissions before considering any offsetting. We will describe progress accurately and will not claim to be carbon neutral or Net Zero unless the relevant criteria and evidence support that claim.
2. Baseline and reported emissions
The baseline is taken from the Carbon Footprint Ltd report for 1 July 2025 to 30 June 2026. The report records one employee and reports both market-based and location-based emissions.
|
GHG Protocol scope |
Market-based (tCO₂e) |
Location-based (tCO₂e) |
Reported sources / notes |
|
Scope 1 |
19.14 |
19.14 |
Natural gas |
|
Scope 2 |
0.00 |
23.57 |
Purchased electricity; market-based factor reported as 0 gCO₂e/kWh |
|
Scope 3 |
3.38 |
13.00 |
Indirect emissions; confirm full category coverage and underlying data |
|
Total |
22.53 |
55.71 |
Both methods retained for transparent dual reporting |
The detailed report lists 105,000 kWh of natural gas, 180,000 kWh of electricity, 70-mile car journeys recorded five times, and 2,000 rail miles. It reports 19.14 tCO₂e for natural gas, 25.91 tCO₂e for location-based electricity (before the report's WTT presentation), 0.07 tCO₂e for hire-car emissions and 0.10 tCO₂e for rail emissions.
Data validation action: This report is self-assessed and has not been independently verified. Any corrections will be documented and the baseline recalculated consistently if necessary.
3. Reduction objectives
The following are proposed management targets for approval. They are deliberately provisional until the baseline data and premises allocation have been validated. The company will retain both market-based and location-based reporting and will avoid relying solely on a zero market-based electricity result.
|
Proposed objective |
Measure |
Target / timing |
|
Validate the baseline |
Reconcile energy and travel data to invoices, meter records and business records |
Complete within 3 months of plan approval |
|
Reduce energy-related emissions |
Reduce gas and electricity consumption attributable to the company, measured in kWh and tCO₂e |
Aim for 5% reduction against validated baseline within 12 months |
|
Medium-term reduction |
Reduce total location-based emissions against validated baseline |
Aim for 10% reduction within 3 years, subject to baseline validation and operational control |
|
Reduce business travel emissions |
Record business travel by mode and mileage; prioritise rail and virtual meetings where suitable |
Review quarterly; year-on-year reduction target set after first complete travel dataset |
|
Improve data quality |
Maintain records for energy, travel and material Scope 3 categories included in the footprint |
Annual footprint calculation, with quarterly data collection where practicable |
Targets will be reviewed after baseline validation. If the reported building energy use is shared or outside the company's operational control, targets will be adjusted to use a fair and evidenced allocation or to focus on the emissions the company can influence.
4. Planned carbon reduction actions
|
Area |
Actions |
Measure / evidence |
Responsibility / timing |
|
Premises energy – gas |
Review heating schedules and thermostat settings with the landlord / facilities provider; avoid heating unoccupied areas; report faults; encourage sensible temperature settings. |
Gas bills or allocated kWh; heating schedules; maintenance requests. |
[Plan owner] / ongoing |
|
Premises energy – electricity |
Switch off lights, monitors and equipment when not in use; enable power-saving settings; use efficient lighting and equipment when replacements are needed; investigate renewable electricity supply and retain tariff evidence. |
Electricity bills / allocated kWh; equipment settings; tariff or supplier evidence. |
[Plan owner] / ongoing |
|
Business travel |
Use video meetings where practical; favour rail and public transport over hire cars where suitable; combine journeys; consider lower-emission vehicles when a car is necessary. |
Travel log showing date, purpose, mode, distance and emissions factor used. |
[All staff] / ongoing |
|
IT and equipment |
Extend useful equipment life through maintenance and repair; consider refurbished equipment; reuse or responsibly recycle end-of-life devices through suitable providers. |
Asset register; repair and purchase records; WEEE transfer / recycling evidence where applicable. |
[Plan owner] / as required |
|
Paper and office materials |
Use digital recruitment and administration processes; print only when needed; print double-sided; reuse stationery and recycle paper/card where facilities exist. |
Purchasing records; printer usage where available; waste arrangements. |
[All staff] / ongoing |
|
Suppliers and services |
Consider environmental performance when selecting relevant suppliers; ask key suppliers about energy, travel, packaging, reuse and waste practices where proportionate. |
Supplier questionnaire / procurement notes; contract requirements where relevant. |
[Plan owner] / annual review |
|
Staff awareness |
Share practical energy, travel and resource-saving guidance during induction or team communications. |
Induction materials; communications; training / briefing records. |
[Plan owner] / annual |
5. Roles and responsibilities
A member of management will own this plan and coordinate data collection, action tracking and annual reporting. All employees are expected to follow relevant resource-saving practices and report avoidable energy use, leaks or equipment faults. Landlords, facilities providers and suppliers will be engaged where they control relevant premises, utilities or services.
|
Role |
Responsibility |
|
Plan owner: Sarah Mainwaring / HR Manager |
Maintain the plan, coordinate footprint calculations, monitor actions and report progress to management. |
|
Management |
Approve targets and resources, review performance and authorise plan updates. |
|
Employees |
Follow practical energy, travel and resource-saving measures and provide accurate travel / activity information. |
|
Landlord / facilities provider / suppliers |
Provide relevant consumption or service information and support improvements where within their control. |
6. Monitoring, reporting and review
Progress will be monitored using available utility bills, meter or landlord data, travel records, purchasing information and waste / equipment records. The company will review progress at least annually and, where practicable, check action progress quarterly. The next carbon footprint assessment will use a consistent 12-month period and calculation approach so that changes can be compared meaningfully.
|
KPI |
Baseline |
Latest result |
Review frequency |
|
Market-based emissions (tCO₂e) |
22.53 |
20.84 |
Annual |
|
Location-based emissions (tCO₂e) |
55.71 |
52.93 |
Annual |
|
Natural gas consumption (kWh) |
105,000 reported |
99,750 |
Quarterly / annual |
|
Electricity consumption (kWh) |
180,000 reported |
171,000 |
Quarterly / annual |
|
Business travel: hire car miles |
350 miles reported |
300 miles |
Quarterly |
|
Business travel: rail miles |
2,000 miles reported |
2,200 miles |
Quarterly |
|
Actions completed |
Not applicable |
4 actions completed |
Quarterly |
7. Communication and continual improvement
The plan and relevant progress will be communicated to employees and, where appropriate, clients and suppliers. Any external environmental statements will be accurate, proportionate and supported by evidence. The company will use the annual review to identify further practical reductions and update targets where better data or changes in operations justify doing so.
8. Approval
|
Approval |
Details |
|
Approved by |
Estelle Raybon |
|
Position |
Operations Director |
|
Signature |
E Raybon |
|
Date |
18/08/2026 |
|
Next review date |
01/08/2027 |
Appendix: Baseline assumptions and limitations
The baseline figures in this plan are transcribed from KPI Recruiting Ltd's Carbon Footprint Ltd Sustrax self-assessed report generated 14 July 2026 for 1 July 2025 to 30 June 2026. The report states that its data has not been verified or checked by Carbon Footprint Ltd and that emissions are calculated using the software's emissions factors. The report presents both location-based and market-based totals in line with the GHG Protocol dual-reporting approach.